Hi Carsten,
I did actually get to the bottom of the problem. You need to download additional software called Powertool to program the 6128-102 Flush-mounted RTR.The VD file is imported into ETS from the powertool folder rather than the main ABB database. When you then go to edit parameters in ETS, the software Powertool opens where you can set it up. Once this is done you can then download to either the 6120/12 or 6120/13 bus couplers.
Hope this helps. If you have anymore question feel free to ask.
Regards,
Neil
Ankündigung
Einklappen
Keine Ankündigung bisher.
ABB 6128-102 and 6120 bus coupler
Einklappen
X
-
Hi Neil.Zitat von neilc Beitrag anzeigenHi everyone,
My name is Neil Cummins and I live in Ireland. KNX is fairly new to Ireland but I have completed KNX training in ABB Heidelberg through my employer. At the moment I am starting to install KNX into my house on a phased basis.
Everything was going well untill yesterday. In the ABB catalogue for the 6128-102 Flush-mounted RTR with switch sensor, 2gangit says it is to be used with 6120/12 and 6120/13 bus couplers. I ordered the 6120/12 but when I try to download the application program it says its a incompatible BCU version and that 13 is required. All ABB documentation says 6120-12 can be used.
Has anyone else had this problem or is there anything I can do. I am pretty sure I have the correct database product file. Is there another version I can use.
I don't want to use the 6120/13 version unless I have to as it's more expense plus I'll also need another seperate power supply which I think is also 24v.
Any help would be great.
Regards,
Neil
Bing Translation
Tag zusammen
Mein Name ist Neil Cummins, und ich wohne in Irland. KNX ist recht neu nach Irland, aber ich über mein Arbeitgeber KNX-Ausbildung in ABB Heidelberg abgeschlossen haben. Im Moment bin ich starten, KNX in meinem Haus auf gestaffelten Basis zu installieren.
Alles würde auch gestern bis. In der ABB-Katalog für die 6128-102 Flush-mounted RTR mit Switch-Sensor, 2gang, die es sagt es mit 6120/12 und 6120 verwendet werden soll/13 bus-Koppler. Ich bestellte die 6120/12, aber beim Versuch, das Anwendungsprogramm herunterladen es sagt, dass seine eine inkompatible BCU-Version und, dass 13 erforderlich ist. Alle ABB-Dokumentation, sagt 6120-12 verwendet werden kann.
Hat jemand dieses Problem hatte, oder gibt es alles, was ich tun kann. Ich bin ziemlich sicher noch die richtige Datenbank-Produkt-Datei. Gibt es eine andere Version kann ich verwenden.
Ich möchte nicht die 6120/13-Version zu verwenden, es sei denn, ich zu, haben wie es weitere Kosten plus ist ich auch einen anderen separater-Netzteil benötigen, der meines Erachtens auch 24v ist.
Hilfe wäre sehr.
Mit freundlichen Grüßen
Neil
do you have the answer for your problem? I have the same problem now. I think that the bus couplers 6120 need a new firmware, but i'm not sure. On the busch-Jäger homepage is written that the 6120 bus couplers need firmware 2.1.
best regards
Carsten
Einen Kommentar schreiben:
-
ABB 6128-102 and 6120 bus coupler
Hi everyone,
My name is Neil Cummins and I live in Ireland. KNX is fairly new to Ireland but I have completed KNX training in ABB Heidelberg through my employer. At the moment I am starting to install KNX into my house on a phased basis.
Everything was going well untill yesterday. In the ABB catalogue for the 6128-102 Flush-mounted RTR with switch sensor, 2gangit says it is to be used with 6120/12 and 6120/13 bus couplers. I ordered the 6120/12 but when I try to download the application program it says its a incompatible BCU version and that 13 is required. All ABB documentation says 6120-12 can be used.
Has anyone else had this problem or is there anything I can do. I am pretty sure I have the correct database product file. Is there another version I can use.
I don't want to use the 6120/13 version unless I have to as it's more expense plus I'll also need another seperate power supply which I think is also 24v.
Any help would be great.
Regards,
Neil
Bing Translation
Tag zusammen
Mein Name ist Neil Cummins, und ich wohne in Irland. KNX ist recht neu nach Irland, aber ich über mein Arbeitgeber KNX-Ausbildung in ABB Heidelberg abgeschlossen haben. Im Moment bin ich starten, KNX in meinem Haus auf gestaffelten Basis zu installieren.
Alles würde auch gestern bis. In der ABB-Katalog für die 6128-102 Flush-mounted RTR mit Switch-Sensor, 2gang, die es sagt es mit 6120/12 und 6120 verwendet werden soll/13 bus-Koppler. Ich bestellte die 6120/12, aber beim Versuch, das Anwendungsprogramm herunterladen es sagt, dass seine eine inkompatible BCU-Version und, dass 13 erforderlich ist. Alle ABB-Dokumentation, sagt 6120-12 verwendet werden kann.
Hat jemand dieses Problem hatte, oder gibt es alles, was ich tun kann. Ich bin ziemlich sicher noch die richtige Datenbank-Produkt-Datei. Gibt es eine andere Version kann ich verwenden.
Ich möchte nicht die 6120/13-Version zu verwenden, es sei denn, ich zu, haben wie es weitere Kosten plus ist ich auch einen anderen separater-Netzteil benötigen, der meines Erachtens auch 24v ist.
Hilfe wäre sehr.